One team, from the first drawing to the final finish
Kitchen renovations, with every trade in order.
A new kitchen is more than new cupboards. Water and power points may have to move, the splashback needs tiling and the room needs finishing. We design and make the new kitchen and coordinate the work around it, so that you deal with one team.
The kitchen, and everything around it
We design, manufacture and install the new cabinetry, and coordinate the plumbing, electrical work, tiling, ceilings, plastering, painting, flooring preparation, appliance installation and minor building alterations a renovation needs.
Coordinating the whole job means you don't have to find, brief and chase several contractors, and the work is done in the right order: the points in place before the cabinets arrive, the tiling and painting once they are fitted.
What we take care of
- The design of the new kitchen
- CNC manufacture of the cabinetry
- Plumbing and electrical changes
- Installation by our own team
- Tiling, ceilings, plaster and paint
- Appliance installation
Our own work
Kitchens we've made
Whether a kitchen is being renovated or built from new, its cabinetry is designed and made the same way.
-

Cream and black
Black wall units over cream base units, and an island with tongue-and-groove panels.
Cream & Black Kitchen
-

Two-tone
A stainless extractor between dark glazed wall units, over ivory drawer banks.
Two-Tone Kitchen, Radiokop, Johannesburg
-

Cherry veneer
The hob, the extractor and glazed wall cabinets above black stone tops.
Cherry Veneer Kitchen, Ruimsig, Johannesburg
-

Shaker
The full run in a soft grey painted finish, from the oven to the window.
Shaker Kitchen
From the first drawing to the finished room
How a kitchen renovation runs
-
01
Consultation
We look at the kitchen as it is, talk through what works and what doesn't, and agree a budget.
-
02
Design
We draw the new layout and agree the doors, tops and finishes with you.
-
03
Manufacture
The cabinetry is cut and machined on CNC equipment from the agreed drawings.
-
04
Site preparation
The plumbing and electrical points are moved or added, and any alterations done, before the cabinetry arrives.
-
05
Installation
Our team fits the cabinets, the tops and the hardware.
-
06
Finishing
The splashback is tiled, the room painted and the appliances installed, until the kitchen is ready to use.
Coordinated around the joinery
The trades in a kitchen renovation
-
01
Plumbing
The sink, the taps and the waste, and the points for the dishwasher and the washing machine, where the new layout needs them.
-
02
Electrical
Plug and appliance points, the extractor connection, and the lighting under the wall cabinets.
-
03
Tiling
The splashback, and the floor if it is being redone.
-
04
Ceilings, plaster & paint
Plastering, the ceiling and the paint, so the room is finished, not just fitted.
-
05
Appliances
The ovens, the hob, the extractor and the rest of the appliances, installed.
-
06
Alterations
Flooring preparation and minor building alterations.
Questions
What people ask us.
- Do I need to find my own plumber, electrician or tiler?
- No. We coordinate the plumbing, electrical work, tiling, ceilings, plastering, painting and appliance installation as part of the project, with one point of contact from start to finish.
- In what order is the work done?
- The plumbing, electrical and any building work come first. The cabinetry is installed once the room is ready for it, and the tiling, painting and final details finish the room.
- Is the quote free?
- Yes. Send us photographs of the kitchen as it is and rough measurements, and we'll arrange a free consultation and quote.
- Can the bathroom or a bar be done at the same time?
- Yes. We make vanities, bars and built-in cupboards as well, and the work around them can be coordinated as one project. Turnkey renovations
Start a project
Tell us about your space.
Send us a few photographs and rough measurements on WhatsApp, or fill in the quote form. We'll come back to you to talk it through and arrange a free consultation.
- Call 081 039 3732
- info@anovakitchens.co.za
- Mon – Fri, 08:00 – 17:00